Projects

Project: Castle Court
This contract represented the final phase of the Putney Bridge development for St George. EYG had completed all the previous phases directly for St George themselves. Bringing the overall value to over £2.5m.
Fronting onto Putney High Road this courtyard design of apartments and commercial areas is now a thriving vibrant community in its own right. Occupied as the 'flagship' London outlet for Laura Ashley - the design called for ground floor glazing with 'maximum vision potential'.
Designed with the assistance of St Gobain - glazed units almost 6m long were installed utilising specialist lifting equipent.
Products:
Technal mc curtain walling
Technal fxi52 tilt turn windows & balcony doors
Technal commercial entrance doors